The short answer: there is no official national price for a septic inspection, and any single number you see online is somebody's survey, not a rule. What does exist is a paper trail of published fees. Where a county does the inspection itself at a home sale, the current fees we found run from $175 (Chautauqua County, New York, septic only, 2026) to $385 (Pueblo County, Colorado, 2026, pumping paid separately). Where a private inspector does the work and the county only reviews the report, the county's own fee runs from $60 (Gunnison County, Colorado, 2026) to $500 (Boulder County, Colorado, 2026), and that is on top of the inspector's bill.
For the private inspection itself, only a few official bodies put a price on record. Penn State Extension says a real-estate inspection in south-central Pennsylvania runs $350 to $700 in 2026, about $625 to $1,200 once the required tank pumping is added, and $1,125 to $2,200 if a hydraulic load test is needed, while noting the final cost may be higher or lower. Island County, Washington, says local providers charge $100 to $500.
The rest of this page shows where each figure comes from, what pushes a quote up, which fees only appear when something goes wrong, and why a failed system can tie up far more money in escrow than the inspection ever costs.
Why there is no honest national number
A "septic inspection" can mean three different jobs with three different price structures:
- A private inspection by a certified or licensed septic professional. The price is set by the business, not by any agency. It may or may not include pumping the tank.
- A county inspection, done by health department staff under a local sanitary code. Here the fee is published, because a board adopted it.
- A county filing or review fee where the law requires a private inspection but the county must accept the report before the sale can close. You pay the inspector and then pay the county.
Cost-guide websites tend to roll these into one "average." We don't. Every fee below is copied from the agency's own schedule or application form, with the year it applies to. If you live somewhere not listed, the cheapest reliable way to get a real number is to call the county environmental health office and ask for its current fee schedule; our septic inspection at sale page lists the places that require one.
Counties that do the inspection themselves
In these places a county sanitarian, not a private company, inspects the system before a sale, so the fee is the inspection price (pumping and lab work may still be extra).
| Place | What you get | Published fee | Fee year |
|---|---|---|---|
| Chautauqua County, NY | Water and sewage survey at transfer | Sewage only $175; water only (2 samples) $175; both $350; extra water sample $50 | 2026 application |
| Erie County, NY | Property Transfer Certification inspection | Septic with public water $300; septic plus private well $496 | County page, accessed Nov. 2026 |
| Pueblo County, CO | Health department inspects while a pumping company pumps the tank | $385 (pumping company paid separately); optional bacteria water test $25 | 2026 application (rev. 12/31/25) |
| Carroll County, OH | Point-of-sale septic inspection with dye test | $350; with coliform water test $400; re-inspection after repairs $100 | Adopted 3/15/2023, still posted 2026 |
| Tuscarawas County, OH | Point-of-sale evaluation | Sewage $350; water $75 plus lab fees; combined $425 plus lab fees | 2026 schedule |
| Benzie and Leelanau counties, MI | Sewage evaluation; well evaluation | Sewage $300 ($195 if a prior evaluation or permit since 1/1/1990); well evaluation incl. coliform and nitrate $250 | FY 2027, effective Nov. 1, 2026 |
| Antrim, Charlevoix and Emmet counties, MI (applies in Elk Rapids Township, Elk Rapids Village, Milton Township and Torch Lake Township) | Real estate transfer/refinance evaluation | $378, includes water analysis | Effective Jan. 7, 2026 |
| Ottawa County, MI | Real estate evaluation | Sewage only $306; sewage and water $412 | Effective Oct. 1, 2025 (archived March 2026) |
Two things stand out. First, the sewage part alone sits between $175 and $385 in this table, but those prices hide very different jobs: Carroll County doses a set amount of water through the system based on the number of bedrooms, while Chautauqua County may need every tank and distribution box uncovered and a pumper on site. Second, several of these counties price the well and the septic separately, so a house with both pays more. That difference is worked out in the water-test section below.
Show the numbers
| Item | Value | Note |
|---|---|---|
| Preliminary report (allows closing; full evaluation still required) | 122 US dollars | |
| Private sewage system only | 306 US dollars | |
| Rush fee, 5 business days (added to the evaluation) | 306 US dollars | |
| Private water supply only | 332 US dollars | |
| Private water supply + lead | 357 US dollars | |
| Private sewage and water supply | 412 US dollars |
County health department fees effective October 1, 2025, as shown in the Internet Archive capture of March 2, 2026 (the live page is not reachable from our location). The county updates fees each year in line with the Consumer Price Index. Source: Ottawa County, MI, Environmental Health Fees, Real Estate Services (effective Oct. 1, 2025; Internet Archive capture of March 2, 2026), accessed 2026-11-09.
Counties that review a private inspection: the fee on top
The Colorado counties below, Grand Traverse County in Michigan and Pierce County in Washington use a different model. You hire a qualified private inspector (and often a pumper), then file the report with the county, which issues an acceptance document, permit or certificate before closing. The county fee below is not the inspection price. It is added to it.
| Place | County fee for | Published fee | Who inspects | Fee year |
|---|---|---|---|---|
| Gunnison County, CO | Transfer of Title application | $60 | County-licensed Transfer of Title Inspector | Form dated 06/2026 |
| Clear Creek County, CO | Use Permit | $100 | Transfer of Title Inspector; pumping receipt required | County page, no date shown (accessed Nov. 2026) |
| Archuleta County, CO | Transfer of Title Acceptance Document | $115 (the county's general septic re-inspection fee is $50) | NAWT-certified third-party inspector | Fee schedule adopted July 2026 |
| La Plata County, CO | Continued Use Permit | $120 | NAWT-certified third-party inspector | Guide dated May 2026 |
| Pueblo County, CO | Review of a certified inspector's report | $140 | NAWT-certified inspector (or the county, $385, see above) | 2026 application |
| Grand Traverse County, MI | Time-of-transfer evaluation review | Septic only $200; well only $200; well and septic $300 | County-certified private evaluator | 2026 schedule |
| Pierce County, WA | Report of System Status for a real estate transaction | $480 ($240 for a second application inspected at the same visit) | Septic service company pumps and inspects; county then inspects the property | 2026, effective Jan. 1, 2026; 2027 proposal: no change |
| Boulder County, CO | Property Transfer Certificate | $500 | Private inspection of the entire system | County page, no date shown (accessed Nov. 2026) |
Grand Traverse County’s regulation states it plainly: county fees must be paid before the property is transferred, and certified third-party evaluators "are responsible for establishing their own fees for evaluations" (Section IX). Pueblo County shows both models side by side. Have the county inspect and you pay the county $385 plus the pumper. Hire a certified inspector and you pay the county $140 plus the inspector plus the pumper. Which one costs less depends on what local inspectors charge, which Pueblo County does not publish.
Washington's King County works differently again. The seller schedules an inspection by a certified on-site system maintainer, and at transfer the buyer must pay the county's Operation and Maintenance Program fee; the county's sales page does not state the amount.
Show the numbers
| Item | Value | Note |
|---|---|---|
| Request for exemption | 180 US dollars | |
| Second application, inspected at the same visit | 240 US dollars | |
| Re-inspection | 360 US dollars | |
| Report of System Status for a real estate transaction | 480 US dollars | |
| 90-day conditional issuance | 600 US dollars |
Tacoma-Pierce County Health Department 2026 fees, effective January 1, 2026. These are county fees; the septic company's pumping and inspection are paid separately. The 2027 proposed schedule shows no change to these fees. Source: Tacoma-Pierce County Health Department, Fee Schedule (2026 rates, effective Jan. 1, 2026), accessed 2026-11-09.
What a private inspection costs, where an official source says so
Agencies rarely publish private prices, because they don't set them. These are the only official or university statements we found, each with its date. They describe different places, years and job scopes, so read them side by side, not as one range.
| Source | Where and when | What it says |
|---|---|---|
| Penn State Extension | South-central Pennsylvania, "as of 2026" (page updated March 11, 2026) | Base real-estate inspection $350 to $700. Pumping, which this inspection standard requires, "typically adds $275 to $500." Together about $625 to $1,200. A hydraulic load test "can add $500 to $1,000." With pumping and load test, $1,125 to $2,200. |
| Island County Public Health | Island County, Washington, realtor page (accessed Nov. 2026) | The county "does not set prices"; fees vary by professional, system type, travel and how much searching and digging is needed. "Costs vary from $100-$500." |
| Skagit County | Skagit County, Washington, press release of March 13, 2006 | Inspection cost of $100 to $300, per the county health department at the time the transfer rule began. Twenty years old. |
| University of Arizona Cooperative Extension, AZ1159 | Originally published 2000, revised April 2018 | "Approximately $55 to $150" for an inspection; $150 to $1,000 for pumping, "depending on the ease of access and the amount of solids." |
| King County Public Health | King County, Washington (accessed Nov. 2026) | No dollar figure: "An inspection costs less than pumping the septic tanks." |
The Arizona and 2006 Skagit figures show how quickly published prices age. Neither should be used as today's price; they are here because they are the official statements that exist, and because they say the same thing the newer ones say about what moves the price: access, solids and travel.
One county pays part of the bill. Skagit County, Washington, offers rebates of up to $100 for an inspection and up to $100 for pumping (up to $500 per household across all categories) for qualifying residents, for work done from February 1, 2024, through December 31, 2026, or until grant money runs out. To qualify you must own a residence in the county, complete the county's free Septics 101 class within the last six years and use a county-certified provider. Ask your own county whether it runs something similar; our well and septic cost guide lists other help programs.
What drives the price up or down
Every fee schedule and extension page above points to the same handful of cost drivers. If you understand them, you can read a quote and tell whether it is high or just thorough.
Pumping: required, optional, or a trap
Pumping is the biggest swing item. Some programs require it as part of the inspection: Penn State says the standardized Pennsylvania real-estate inspection requires that "all treatment (septic or aerobic) and dose tanks be pumped during the inspection." Pueblo County says the tank "must be pumped and cleaned" and the county inspects while the pumper is there. Clear Creek County wants the pumping receipt with the inspection form. Pierce County tells sellers to have the tanks pumped and inspected before applying.
Elsewhere pumping depends on what the inspector finds. EPA's homeowner guidance says a tank should be pumped when the scum or sludge reaches set depths near the outlet, or when "more than 25 percent of the liquid depth is sludge and scum." La Plata County says you "may need" to have the tank pumped and tells you to confirm with the inspector in advance.
Here is the trap. Pumping the tank right before a sale can make the inspection cost more, not less. Penn State lists a tank "pumped less than 30 days before the inspection" as one reason a hydraulic load test may be needed, because normal flow can no longer be confirmed. Chautauqua County will not schedule an appointment until 30 days of occupancy after the tank has been pumped. If you are a seller, ask the inspector before you call the pumper.
Tank size and the number of tanks or systems
Penn State says pumping cost depends "on the size of your tanks," and that the overall price depends on "system size and complexity." County fees scale the same way. Chautauqua County charges $175 per well and $175 per treatment system, so a property with two systems pays twice. Archuleta County requires a separate application and inspection report for each system on the property, according to its application form. Pierce County charges $480 for the first Report of System Status and $240 for a second one inspected at the same visit.
Finding and uncovering the system
Island County lists "how much searching and digging is needed to find the system" as a price factor. The Arizona extension sheet spends a whole step on locating a buried tank. County rules decide how much must be exposed: Pueblo County wants the lids uncovered and removed and the absorption area located, and may require part of it uncovered; Chautauqua County requires all components (tanks, distribution box, seepage pits) uncovered if the system was not installed under a county permit or was permitted more than 30 years ago. Benzie-Leelanau's holding-tank evaluation notes that no credit is given for digging up the lids. If you have the system's permit drawing, the inspector spends less time with a probe rod; our guide to finding well and septic records shows where to look.
Testing the drainfield, not just the tank
A look in the tank tells you about sludge and baffles. It does not prove the drainfield can take a household's daily flow. Two common ways of testing that add time and money:
- Hydraulic load test. Penn State says it is typically needed when normal flow can't be confirmed (home vacant more than a week, recently pumped, seasonal use), when there are signs the drainfield is not absorbing properly, or when conditions are unclear. Penn State says it can add $500 to $1,000.
- Dye test with an occupancy rule. Carroll County dye-tests the system and doses "a certain amount of water (determined by the number of bedrooms of the home)." Chautauqua County requires the home to be occupied continuously for at least 30 days before and 7 days after the inspection. Erie County will not inspect a property vacant more than 90 days; the buyer must instead apply for a variance.
An empty house for sale is the classic case where these rules bite, and the extra visit or variance paperwork costs money.
Camera work and add-ons
None of the government fee schedules we read includes a camera inspection of the pipes. If a private inspector recommends one, it is a separate line on the quote, and it is fair to ask what finding triggered it.
The county's fee on top
Where the county reviews a private report, budget its fee separately: $60 to $500 across the Colorado, Michigan and Washington review fees in the table above. Tuscarawas County also lists a $75 point-of-sale review fee per certificate of transfer next to its own inspection fees; ask whether it applies to your sale.
Adding the well test
If the house also has a private well, several counties test it in the same visit, and the difference between their septic-only and combined prices shows what the water part costs locally:
| Place | Septic only | Septic and well | Well part adds |
|---|---|---|---|
| Erie County, NY | $300 | $496 | $196 |
| Chautauqua County, NY (2026) | $175 | $350 (2 water samples) | $175 |
| Ottawa County, MI (eff. Oct. 1, 2025) | $306 | $412 | $106 |
| Grand Traverse County, MI, review fee only (2026) | $200 | $300 | $100 |
| Tuscarawas County, OH (2026) | $350 | $425 plus lab fees | $75 plus lab fees |
| Carroll County, OH (adopted 2023) | $350 | $400 (coliform bacteria test) | $50 |
| Pueblo County, CO (2026) | $385 | $410 (optional bacteria test) | $25 |
The spread looks large because the water part is not the same job: Pueblo's $25 is one bacteria test, Benzie-Leelanau's $250 well evaluation includes coliform bacteria and nitrate plus a look at the well, and Erie County inspects the well and its surroundings. A home buyer usually wants more than a bacteria test. Our well water testing cost guide and the certified lab finder show what a fuller panel costs, and the well inspection guide covers checking the well itself.
Fees that only appear when something goes wrong
A clean inspection on the first visit is the cheap case. Schedules also list what you pay for a second visit, a rush, or skipping the process.
| Place | Situation | Published amount |
|---|---|---|
| Archuleta County, CO | Septic re-inspection (general fee) | $50 |
| Carroll County, OH | Re-inspection for repairs | $100 |
| Pierce County, WA | Report of System Status re-inspection; 90-day conditional issuance | $360; $600 |
| Ottawa County, MI | Rush (5 business days); preliminary report that allows closing; sale with no evaluation completed | +$306; $122; evaluation fee + $250 |
| Grand Traverse County, MI | After-the-fact review; corrective action review | $150 extra; $100 |
| Benzie-Leelanau, MI | Late fee | 50% of the permit or evaluation fee |
| Chautauqua County, NY | Transfer without county certification | Fine of $2,000 may be imposed on each party |
| Erie County, NY | Buyer fails to allow inspection before a variance expires | Penalty of up to $500 per day of violation |
Note what Boulder County says about speed: it may take up to ten business days to issue a certificate, and "we do not expedite." Pierce County aims to review within 10 business days and says this "can not be rushed or guaranteed." In those places, starting late does not buy you a rush option at any price.
Winter sales
Frozen ground stops dye tests and drainfield checks, which changes the cost picture for a sale between late fall and spring. Chautauqua County does not run dye tests from December 1 to April 1. Erie County suspends transfer inspections once frozen ground or snow cover arrives. La Plata County can issue a conditional permit if the buyer agrees in writing to finish inspections or repairs later. Massachusetts lets the Title 5 inspection happen up to six months after a sale if weather prevents it, provided the seller notifies the buyer in writing. In several Minnesota counties, a winter sale means money in escrow, which is the next section.
Escrow: the number that can dwarf the inspection fee
Some Minnesota counties do not let a home with an uninspected or failing system change hands unless money is set aside to fix it. These are not inspection fees. They are amounts held by a closer, attorney or bank until a compliant system is installed, and they are tied to the cost of the repair, not the inspection.
| County | When escrow is required | Amount | Source date |
|---|---|---|---|
| Douglas County, MN | Winter transfer; transfer before a non-compliant system is replaced; transfer before abandonment | $7,500 or 150% of a written estimate | County form dated 11-2020 (read via Internet Archive capture of May 3, 2025) |
| Nobles County, MN | Seller provides no Certificate of Compliance | 150% of a licensed installer's written estimate, or 110% of the written contract price | Ordinance § 719.16 as posted on the county site (file dated December 2016) |
| Fillmore County, MN | System must be brought up to code and work is not done before transfer; also frozen-ground sales Nov. 1 to Apr. 30 | 150% of estimated cost if the system has not been inspected; 115% if inspected, found non-compliant and a detailed estimate is approved | Ordinance amended Oct. 27, 2021, § 803 |
Fillmore County's two percentages show why the inspection pays for itself in a sale. Take a hypothetical $20,000 written estimate for a replacement system. Without an inspection, the escrow is 150%: $30,000. With an inspection and an approved estimate, it is 115%: $23,000. The inspection fee is small next to the $7,000 difference in cash tied up at closing.
Replacement is the real money. Penn State says that in Pennsylvania a replacement or new installation "can cost the new homeowner anywhere from $10,000 to $60,000 or more, depending on the type of septic system and the location in the state." Nobles County also has a winter path: if frozen soil prevents an inspection, the parties sign a winter agreement that includes a septic permit application and an inspection by the following June 1, and the permit fee is refunded if the system turns out compliant.
Who pays for the septic inspection
Many county rules say who must arrange the inspection and few say who must pay; the purchase contract usually settles the rest. What the rules we read actually say:
- Seller arranges, by rule: Erie County says the seller "must submit the application and required fee." Island County says a seller client has "a responsibility to have the septic system inspected before closing." King County says sellers schedule the inspection. Fillmore County makes the seller responsible "unless the buyer and seller agree in writing that the buyer will assume responsibility."
- Owner arranges, parties may switch: in Massachusetts the property owner or operator arranges the Title 5 inspection, and buyer and seller may change that in writing before the transfer. Chautauqua County's application treats the property owner as "typically seller" and asks which party, seller or buyer, is responsible for repairs.
- Buyer pays something: in King County the buyer pays the county's Operation and Maintenance Program fee at transfer. In Douglas County, a buyer who takes a non-compliant system signs that they are responsible for bringing it into compliance. In Boulder County, if repairs can't be finished before closing, the buyer signs an agreement to repair within 365 days.
- Left to the parties: Nobles County requires buyer and seller to sign a statement saying who completes the compliance work and any upgrade.
Penn State adds that "the inspection cost and the necessary replacements or repairs can often be negotiated into the real estate transaction." This page is general information, not legal or financial advice; for your contract, ask your agent or a real estate attorney.
Why a buyer may want an inspection even when the seller already has one
A required inspection answers the county's question. That is not always the buyer's question.
- Narrow purpose. Erie County says the purpose of its transfer inspection is "to ensure that the onsite wastewater treatment system is not discharging sewage to the ground surface." Penn State contrasts a regulatory inspection, where "there is no violation unless the system malfunctions," with a real-estate inspection that also asks whether the system can handle the future occupancy of the home.
- No guarantee. MassDEP says a Title 5 inspection "does not guarantee that the system will continue to function adequately, or that the system will not fail at a later date," which matters most if you plan to add bedrooms or people.
- Reports age, but can be reused. Title 5 inspections for a sale are generally good for 2 years, or 3 years with annual pumping records. Archuleta County acceptance documents and La Plata County permits are valid for twelve months, Pierce County's report for one year, and Skagit County says the inspection should be dated within six months of closing. A valid report from the seller may save the cost of a new one, but it was ordered by the seller.
- Some reports are public. Iowa's time-of-transfer reports go into a DNR database that anyone can search without an account (it holds reports since 2021). In Washington, Island and Skagit counties say a buyer has the right to see the completed inspection report before closing. Read what exists before you pay for more.
The septic system also sits next to the well on most rural lots. If the inspection turns up a failing drainfield, read our guide to septic systems and well water before deciding whether to test for coliform bacteria and nitrate.
How to get a real price for your property
- Find out whether your county or state has a rule at sale. Start at the septic inspection hub or the state pages for Colorado, Michigan, Minnesota, New York, Ohio, Washington, Iowa and Massachusetts.
- Ask the county for its current fee schedule, and whether it inspects itself or reviews a private report. If it reviews, add its fee to every quote.
- Pull the permit and as-built drawing. Knowing where the tank and lids are cuts digging time.
- Ask each inspector whether pumping is included, required or only if needed, and how tank size and the number of tanks change the price.
- Ask what triggers a load test or dye test and whether the home's occupancy history (vacant, seasonal, recently pumped) will force one.
- If there is a well, decide whether the county's water sample is enough or whether you want a fuller panel from a certified lab.
- Check the calendar. A winter closing can mean a conditional permit, a later inspection or escrow.
- Put who pays for the inspection, and for any repairs, in writing in the purchase agreement.
After closing, routine care is the next cost. EPA says the average household system "should be inspected at least every three years" and tanks "are typically pumped every three to five years," with yearly inspections for alternative systems with mechanical parts. Our septic system maintenance guide covers the schedule.
Questions people ask
How much does a septic inspection cost?
Does a septic inspection include pumping?
How much do septic inspection and pumping cost together?
Who pays for the septic inspection when a house is sold?
Why does the county charge a fee if I already paid an inspector?
Is septic escrow the same as an inspection fee?
How long is a septic inspection good for?
- Penn State Extension, On-Lot Septic System Inspections During Real Estate Transactions (updated March 11, 2026) (accessed 2026-11-09)
- Island County, WA, Realtor Resources: Onsite Sewage (Septic) Systems (accessed 2026-11-09)
- Skagit County, WA Public Health, On-Site Septic Program (rebates for work Feb. 1, 2024 to Dec. 31, 2026) (accessed 2026-11-09)
- Skagit County, WA, press release: Septic system inspections required at time of property transfers (March 13, 2006) (accessed 2026-11-09)
- University of Arizona Cooperative Extension, Inspecting Your Household Septic System, AZ1159 (originally published 2000, revised 04/18) (accessed 2026-11-09)
- King County, WA Public Health, On-site sewage/septic system inspections (accessed 2026-11-09)
- King County, WA Public Health, Septic system requirements for property sales and transfers (accessed 2026-11-09)
- U.S. EPA, How to Care for Your Septic System (last updated August 17, 2026) (accessed 2026-11-09)
- MassDEP, Buying or selling property with a septic system (Internet Archive capture of May 18, 2026; mass.gov returns 403 to our location) (accessed 2026-11-09)
- Iowa DNR, Time of Transfer (accessed 2026-11-09)
- Archuleta County, CO, Fee Schedule (updated and adopted July 2026), Water Quality: OWTS fees (accessed 2026-11-09)
- Archuleta County, CO Water Quality Department, Transfer of Title Inspections: A Brief Overview for Buyers and Sellers (2024) (accessed 2026-11-09)
- La Plata County Public Health, Continued Use Permit guide for buyers and sellers (PDF dated May 2026) (accessed 2026-11-09)
- Gunnison County, CO, Transfer of Title Acceptance OWTS Application (06/2026) (accessed 2026-11-09)
- Boulder County Public Health, OWTS Property Transfer (accessed 2026-11-09)
- Clear Creek County, CO, Use Permit (accessed 2026-11-09)
- Pueblo Department of Public Health and Environment, 2026 OWTS Transfer of Title Application (rev. 12/31/25) (accessed 2026-11-09)
- Benzie-Leelanau District Health Department, FY 2027 Environmental Health Fees (effective November 1, 2026) (accessed 2026-11-09)
- Health Department of Northwest Michigan, Environmental Health Services Fee Schedule, Antrim, Charlevoix and Emmet Counties (effective January 7, 2026) (accessed 2026-11-09)
- Grand Traverse County Environmental Health, Time of Transfer Program 2026 Fee Schedule (accessed 2026-11-09)
- Ottawa County, MI, Environmental Health Fees (effective October 1, 2025; Internet Archive capture of March 2, 2026; live page country-blocked) (accessed 2026-11-09)
- Chautauqua County Health Department, Water Sewage Survey Application (property transfer), 2026 (accessed 2026-11-09)
- Erie County Department of Health, NY, Property Transfers (accessed 2026-11-09)
- Carroll County General Health District, OH, Point of Sale (fees adopted 3/15/23, Resolution 22-149) (accessed 2026-11-09)
- Tuscarawas County Health Department, 2026 Environmental Health Service Fees (accessed 2026-11-09)
- Tacoma-Pierce County Health Department, Selling Your Property (Report of System Status) (accessed 2026-11-09)
- Tacoma-Pierce County Health Department, Fee Schedule (2026 rates, effective Jan. 1, 2026) (accessed 2026-11-09)
- Tacoma-Pierce County Health Department, 2027 Proposed Fee Schedule (October 8, 2026) (accessed 2026-11-09)
- Douglas County, MN, Point of Sale/Transfer form for systems with a Certificate of Compliance (11-2020; Internet Archive capture of May 3, 2025) (accessed 2026-11-09)
- Nobles County, MN, Subsurface Sewage Treatment System (SSTS) Ordinance, § 719.16 (file dated December 2016) (accessed 2026-11-09)
- Fillmore County, MN, Septic Ordinance (adopted Dec. 3, 2013; amended Oct. 27, 2021), § 803 (accessed 2026-11-09)
- Grand Traverse County, Regulation for the Evaluation of Onsite Water and Sewage Disposal Systems at Time of Property Transfer (Section IX, Fees) (accessed 2026-11-09)
- Archuleta County, Transfer of Title Application (PDF, 2024) (accessed 2026-11-09)